Studies in the context of the second periodical evaluation (2026)
- Costs of closing Maeslant barrier for the port and shipping (Dutch)
- Regional impact analysis: study of the effects of sea level rise on existing buildings and spatial planning, behind the dikes, in the dike zone and outside the dikes (Dutch)
- Long-term Delta Programme strategies – flood risk management (Dutch)
- Development near dikes – An exploration for a Dike Development Framework (Dutch)
First periodical evaluation (2020)
Periodical evaluation
- Preferred strategy for the Rhine Estuary-Drecht Towns Delta Programme 2020 (Dutch)
- Letter of presentation accompanying the Preferred Strategy for the Rhine Estuary-Drecht Towns Delta Programme 2020 (Dutch)
Research projects
Background information
- Delta Decision for the Rhine-Meuse Delta (Dutch)
- Flood risk management standards report: underlying factors and relationship to new construction and vital infrastructure (Dutch)
- Deltares report on the impact of High Scenarios for Sea Level Rise for the Rhine-Meuse Delta (Dutch)
- Utilise the energy transition to improve flood risk management (Voorne-Putten Pilot Project) (Dutch)
- Water-RO Evaluation: towards a smooth line (Dutch)
Preferred strategy (2014)
Periodical evaluation
- Folder for the Rhine Estuary-Drecht Towns Delta Programme (Dutch)
- Fact sheet Implementation Agenda Rhine Estuary-Drechtsteden September 2015 (Dutch)
- Delta Programme 2015 Fact sheet Rhine-Meuse delta (Dutch)
- Delta Programme 2015 Background Document B7 (Dutch)
- Delta Programme 2015 Background Document D5-1 (Dutch)
- Delta Programme 2015 Background Document D5-2 (Dutch)
- Problem Analysis for Rhine Estuary-Drecht Towns (Dutch)
- Summary Plan of Action Rhine Estuary-Drecht Towns (Dutch)
Outside the dikes
- Strategic adaptation agenda for outside the dikes Rhine Estuary-Drecht Towns Delta Programme (update 2023) (Dutch)
- Ten years of work on flood risk management outside the dikes (Dutch)
- Flood risk management in the area outside the dikes (Dutch)